Watch this space…

As I mentioned in the previous blog to watch this space, I have taken a few more photos showing the walls which have just been erected on the second floor. In the photo you can see Trevor nailing in bridging to the floor joists. This is to stabilise the joists stopping them from moving individually, creating a floor that moves as a whole and not in parts. I have also included a short video showing the layout of the chapel storage.

This slideshow requires JavaScript.

The ceiling height this time is 8 feet high or 2.440m as opposed to the ceiling height of the ground floor being 10’-5” or 3.180m high. All in all we will have three floors with ground floor being as stated and the other two being 8”or 2.440 high.

David

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s